5:50 AM. Last night I was only woke up by the turbines 3 or 4 times.
7:20 AM. Wind NE, 18.5 rpms. Jet flying over noise which is quite loud for a NE wind.
8:50 PM. Wind NE 19.2 rpms.There is just a loud motor rumble from turbine 4 and intermittent thumping from turbine 73.
5:00 AM. I was woke up 3 or 4 times last night by the turbines.
6:10 AM. Wind N, calm, 16.3 rpms. There is a loud thumping noise or a wump, wump, wump noise.
9:30 PM Wind NE, 16.9 rpms. Three is a loud motor grinding noise. 10:15 PM. Wind NE. I can hear the grinding noise in the house.
I was woke up numerous time last night b the turbines. 4:30 PM. Wind N, 19.0 rpms. Jet noise is being produced by turbine 4. 8:30 PM. Wind NE, 11.0 rpms. Loud whooshing to a jet flying over noise.
No entry. This does not mean the turbines were loud or quiet. It means I am tired, burned out and down at this constant nonsense. This feeling is happening more and more as time goes on.
No entry. This does not mean the turbines were loud or quiet. It means I am tired, burned out and down at this constant nonsense.
This is a construction photo in the Shirley Wind factory erected by Emerging Energies in the Town of Glenmore near Green Bay, Wisconsin. There are 8 turbines 500 feet tall in the project.
7:05 AM. Wind E, 9.2 rpms. Just a quiet whooshing noise. 9.2 rpms is well below production speed, but the slow turning turbines look good from highway 41.
These turbines are in the Shirley wind factory erected by Emerging Energies. They are 500 feet tall. Several families have left their homes and numerous other families have registered complaints. One non hosting farmer has lost 1/3 of his cows and calves since this wind project has gone on line.
5:10 AM (alarm set for 6:00 AM). Because of the turbine noise and low frequency noise I do not need the alarm at home. Sleep was mixed last night. I was only woke up 3 or 4 y the turbines vs. a typical night of 7 or 8 wake ups. I find it interesting that a woman at Clintonville, WI used the term sleep deprivation because she was woke up several nights by loud sounds that were later diagnosed as a 1.5 earthquake. Sleep deprivation is every night here in the Forward wind factory erected by Invenergy and no one cares. We are expected to endure this.
This is a 500 foot large industrial wind turbine located in the Town of Glenmore near Green Bay, Wisconsin. This group of 8 turbines was erected by Emerging Energies wind company and has been sold twice since Emerging Energies erected it and began operation about December of 2010.